You can post questions and discussions about iRIC in the forum.
Hello everyone,
The snapshot of the comment from Nays2DH is attached. how can I change the number of deposition layers without restart or cancelling the simulation.
Thank you in advance.
コメント
The number of deposited layer exceeds the maximum number 50 at i=
95 j= 39
Please change the thickness of deposited layer, thickness of movable bed layer
or the maximum number of deposited layer.
Fortran Pause – Enter command or to continue.
Bonjour , comment logiciel Riv Marker peut prendre en compte le fichier TIF